Mostrando entradas con la etiqueta Centers. Mostrar todas las entradas
Mostrando entradas con la etiqueta Centers. Mostrar todas las entradas

viernes, 26 de febrero de 2016

Iván Ernesto Moreno Plaza: Supplies and Equipment Provision at MIGLOBAL

MIglobal known in America
Miglobal known in America
Planning and construction of complete projects for the health sector are maybe the work that makes MIGLOBAL Group so famous in the region in terms of health and health construction, and while it is true that those two factors in which the company put great effort and emphasis, this organization covers all aspects of installation of health centers and cares about every last detail of its operation is at 100%, including, of course, the provision of best possible quality materials.

Total medical supply provision
The Department of Procurement and Logistics is responsible for ensuring the provision of the best in disposable and various products that meet the highest standards of quality and functioning, sterilization and packaging; therefore, it has been determined that manufacturing, packaging and distribution will match the rest of the services provided by the company, and with this in mind, MIGLOBAL has used only the best in the industry.

The "Turnkey Projects" have become the very special mark of MIGLOBAL. They could not be completed without dedicating the most advanced medical and surgical equipment of all types to the disposition of the clients. Those projects guarantee their own operation to the required levels.

Design and construction
Design and construction
The staff at MIGLOBAL is dedicated entirely to achieve the installation and services for preventive and corrective maintenance and human resource as well as the medical training in each center to meet the tasks required for proper operation.

miércoles, 20 de enero de 2016

Iván Ernesto Moreno Plaza: The Pre-fabricated Technique: Construction Work of MIGLOBAL

This is a particular construction technique that speeds up the delivery process of any construction project. The building is pre-fabricated remotely in modules which are shipped to the wished location. The land and foundations and utilities lines are simultaneously prepared, and then the modules are positioned to be attached together.

It is a frequent technique developed by MIGLOBAL for smaller buildings:
  • Clinical labs,
  • urgent and ambulatory centers,
  • dialysis centers,
  • support and administration buildings.


Other features
Modular technique
Modular technique
  • The facilities must comply with the handicapped accessibility standards and codes.
  • MIGLOBAL works with all the materials that have to meet the local building codes.
  • Each one of the project plan and designs must be submitted before the local health department and authorities’ approval.


Exterior characteristics
  • Glass or pre-cast architectural paneling walls.
  • Components on architecture subjected to regulations of access and mobility for the disabled.
  • Huge variety of options for exterior finishes; plus the option of adding similar finishes of the existing buildings.
  • Glass or metal doors and ceilings.

Interior characteristics
  • Solid core wooden doors.
  • Tempered glass or stainless steel paneling for sterile and semi-sterile areas.
  • Fiber glass Reinforce Plastic Panels.


Interior Flooring:
  • 5/8 Plywood subfloor and isolation grade R-19
  • Vinyl tile or rolls 1/8” thick.
  • Black carpet to common areas.
  • Plastic base-board.


interior
Interior
OR and sterile areas:

Seamless Wall to Floor Joint

Windows: 

Impact (industry standard size)